South West Water · Mogden formula · 1 April 2026 to 31 March 2027
South West Water trade effluent charges 2026/27
South West Water’s published Mogden formula rates for 2026/27, a worked example from our free calculator, and what moves the bill. Every rate below is linked to South West Water’s own document.
Published Published Wholesale Charges 2026/27, version 3 (Section 7).
The 2026/27 rates
C = R + V + B × (Ot ÷ Os) + S × (St ÷ Ss) [+ M]
| Term | Under 50 Ml a year |
|---|---|
| R (reception and conveyance) £/m³ | £0.7806 |
| V (volumetric and primary treatment) £/m³ | £0.7506 |
| B (biological, strength) £/m³ | £1.4834 |
| S (sludge) £/m³ | £0.8049 |
| M (sea outfall) £/m³ | £0.1030 |
| Os (average settled COD) mg/l | 744 |
| Ss (average suspended solids) mg/l | 449 |
| Minimum charge a year | £387.67 |
Source: South West Water Wholesale Charges 2026/27 (version 3), Section 7. Wholesale charges. Checked 19 Nov 2026.
Worked example
The calculator’s default example: 5,000 m³ a year, settled COD (Ot) 3,000 mg/l, suspended solids (St) 500 mg/l, biological treatment, no sea outfall, no ammonia result.
| Term | Working | £ per m³ |
|---|---|---|
| R Reception | £0.7806 | £0.7806 |
| V Volumetric | £0.7506 | £0.7506 |
| B × Ot ÷ Os Biological, by COD | £1.4834 × 3,000 ÷ 744 | £5.9815 |
| S × St ÷ Ss Sludge, by solids | £0.8049 × 500 ÷ 449 | £0.8963 |
| Charge per m³ | £8.4090 | |
| Volume and strength charge: £8.4090 × 5,000 m³ | £42,045 | |
| Estimated annual charge (excl. VAT) | £42,045 | |
Computed by the calculator’s own engine (mogden.js) from the rates above. Each line is rounded for display; the totals use unrounded values. This effluent is 4.032× the company’s average COD and 1.114× its average solids.
What is specific to South West Water
- Sea outfall: M of £0.1030 per m³ applies where the works discharges through a sea outfall. Tick the sea outfall box in the calculator if that applies to you.
- Minimum charge: £387.67 a year.
- The rates table in the document is headed p/m3, but the values (for example 0.7806) are on the same scale as other companies’ £/m³ rates, so we read them as £/m³.
- Lower reception rates are available above 50 Ml a year on an opt-in tariff. They are not loaded here; type your own R in the calculator if that applies.
Questions
What are Ot and Os?
Ot is the chemical oxygen demand (COD) of your trade effluent after one hour’s settlement, in mg/l, from your sample results. Os is South West Water’s average COD of settled sewage, which it publishes each year: 744 mg/l for 2026/27. The ratio Ot ÷ Os scales the biological charge B: effluent twice as strong as average pays twice the B charge.
And St and Ss?
St is your effluent’s suspended solids in mg/l. Ss is the company’s average for sewage: 449 mg/l for South West Water in 2026/27. The ratio scales the sludge charge S.
How can I cut my South West Water trade effluent bill?
Three levers:
- Lower COD. Only the B and S terms depend on strength. In the worked example, each extra 100 mg/l of settled COD costs about £997 a year, and a 20% cut in COD would save about £5,981 a year. COD comes from organic material reaching the drain, such as lost product, ingredients and some cleaning chemicals, so product recovery, dry clean-up before washdown and tighter cleaning (CIP) control are where to look.
- Keep solids out of the drain. In the same example, a 20% cut in suspended solids would save about £896 a year.
- Send less volume. Every m³ you keep out of the sewer saves the full charge per m³, £8.4090 at the example strength (as long as your bill stays above the £387.67 minimum charge).
Use the calculator with your own results to see your figures. Your consent, sampling and any special agreement decide what you actually pay.
Are these the rates on my bill?
They are the wholesale charges South West Water sets. In England your water retailer bills you, and may pass them on with a margin, so your bill can differ. Domestic sewage, surface water and sampling fees are charged separately.
When do the 2027/28 rates come out?
Water companies publish indicative charges in the autumn and final charges in January, and the two can differ. The new rates apply from 1 April. We update this page from the final schedule.
Before you rely on the numbers
This is an estimate, not a bill. Your trade effluent consent, sampling regime, banding and any special agreement decide what you pay. Rates change every 1 April. Yieldsmith is independent and not affiliated with South West Water or any water company. Check your own bill and South West Water’s charges scheme before making decisions.
2026/27 trade effluent charges for other companies
2027/28 rates: coming after January
Water companies publish next year’s final charges in January. We plan to update the calculator and these pages from the final schedules.
Email updates are not open yet. There is no sign-up form, so nothing is collected. Check back here after the new charges are published.