Southern Water’s published Mogden formula rates for 2026/27, a worked example from our free calculator, and what moves the bill. Every rate below is linked to Southern Water’s own document.

Final Wholesale Charges 2026-27, Part 3 section 2.2. The document was updated on 25 February 2026 for fire hydrant charges.

The 2026/27 rates

C = R + V + B × (Ot ÷ Os) + S × (St ÷ Ss) + M + A × (At − Am) ÷ As

TermStandard tariff
R (reception and conveyance) £/m³£0.9133
V (volumetric and primary treatment) £/m³£0.7726
B (biological, strength) £/m³£0.8777
S (sludge) £/m³£0.5552
M (sea outfall) £/m³£0.1162
Os (average settled COD) mg/l452
Ss (average suspended solids) mg/l400
A (ammonia) £/m³ per 35 mg/l£0.1000
Standing charge band a yearBand 1: £102.44Band 2: £260.32Band 3: £409.07Band 4: £1,069.33Band 5: £2,017.62Band 6: £3,848.95Band 7: £7,512.32

Source: Southern Water Wholesale Charges 2026-27 (amended 25 Feb 2026), Part 3 section 2.2. Wholesale charges. Checked 19 Nov 2026.

Worked example

The calculator’s default example: 5,000 m³ a year, settled COD (Ot) 3,000 mg/l, suspended solids (St) 500 mg/l, biological treatment, no sea outfall, no ammonia result.

TermWorking£ per m³
R Reception£0.9133£0.9133
V Volumetric£0.7726£0.7726
B × Ot ÷ Os Biological, by COD£0.8777 × 3,000 ÷ 452£5.8254
S × St ÷ Ss Sludge, by solids£0.5552 × 500 ÷ 400£0.6940
Charge per m³£8.2053
Volume and strength charge: £8.2053 × 5,000 m³£41,027
Standing charge (Band 1, the calculator’s default)£102.44
Estimated annual charge (excl. VAT)£41,129

Computed by the calculator’s own engine (mogden.js) from the rates above. Each line is rounded for display; the totals use unrounded values. This effluent is 6.637× the company’s average COD and 1.250× its average solids.

What is specific to Southern Water

  • Ammonia is charged from zero: A × (At − 0) ÷ 35, with A at £0.1000. Enter your ammonia result in the calculator to include it.
  • Sea outfall: M of £0.1162 per m³ is added where the receiving works discharges through a sea outfall. Tick the sea outfall box in the calculator if that applies to you.
  • Standing charge: seven bands from £102.44 to £7,512.32 a year, set by the assessed risk of your discharge. The worked example uses Band 1, the calculator’s default; choose your own band there.

Questions

What are Ot and Os?

Ot is the chemical oxygen demand (COD) of your trade effluent after one hour’s settlement, in mg/l, from your sample results. Os is Southern Water’s average COD of settled sewage, which it publishes each year: 452 mg/l for 2026/27. The ratio Ot ÷ Os scales the biological charge B: effluent twice as strong as average pays twice the B charge.

And St and Ss?

St is your effluent’s suspended solids in mg/l. Ss is the company’s average for sewage: 400 mg/l for Southern Water in 2026/27. The ratio scales the sludge charge S.

How can I cut my Southern Water trade effluent bill?

Three levers:

  • Lower COD. Only the B and S terms depend on strength. In the worked example, each extra 100 mg/l of settled COD costs about £971 a year, and a 20% cut in COD would save about £5,825 a year. COD comes from organic material reaching the drain, such as lost product, ingredients and some cleaning chemicals, so product recovery, dry clean-up before washdown and tighter cleaning (CIP) control are where to look.
  • Keep solids out of the drain. In the same example, a 20% cut in suspended solids would save about £694 a year.
  • Send less volume. Every m³ you keep out of the sewer saves the full charge per m³, £8.2053 at the example strength.

Use the calculator with your own results to see your figures. Your consent, sampling and any special agreement decide what you actually pay.

Are these the rates on my bill?

They are the wholesale charges Southern Water sets. In England your water retailer bills you, and may pass them on with a margin, so your bill can differ. Domestic sewage, surface water and sampling fees are charged separately.

When do the 2027/28 rates come out?

Water companies publish indicative charges in the autumn and final charges in January, and the two can differ. The new rates apply from 1 April. We update this page from the final schedule.

Before you rely on the numbers

This is an estimate, not a bill. Your trade effluent consent, sampling regime, banding and any special agreement decide what you pay. Rates change every 1 April. Yieldsmith is independent and not affiliated with Southern Water or any water company. Check your own bill and Southern Water’s charges scheme before making decisions.